Summary

Rig safety begins in the office. Well control incidents such as kicks and blowouts can be catastrophic. Kicks are commonly controlled, however, in the last 40 years in British Columbia, 16 out of 894 (1.7%) of the well control incidents reported to the BC Oil and Gas Commission (OGC) have resulted in blowouts.

Author

Kurt Armbruster

Senior Geologist

Calgary, Alberta, Canada

Published on December 17, 2018

In the worst cases, these can lead to loss of rigs or loss of life.

Fig 1. Drilling tour sheet denoting loss of rig due to kick/blowout.

Fig 1. Drilling tour sheet denoting loss of rig due to kick/blowout.

On the Engineering side of well planning, it is a common practice in the Oil and Gas industry to mitigate the risk of kicks and blowouts by preparing Pore Pressure and Fracture Gradient (PPFG) predictions prior to drilling the well. The PPFG process should include a tabulation of any lost circulation, kick, and blowout incidents. PPFG data are ultimately used to provide a window for the mud weights while drilling, and may dictate additional casing runs.

This paper will demonstrate one Petrel workflow in which a Geologist can contribute to the safety culture of the rig crew. By preparing a simplified cross section depicting the precise stratigraphic location of well control incidents and posting the cross section in the doghouse, OSR shack, or wellsite geologist shack, the author intends to empower rig crews to anticipate zones which may be problematic. With annotated cross sections, rig workers will be able to see a visualization of offset well control incidents in stratigraphic space, in addition to the tabular format generated during the PPFG process. For best results, the geologist should collaborate with their drilling and reservoir engineers during the entire well planning process.

This paper utilizes BC data in Petrel as a case study. The workflow may be applied to any basin in which well control incident data are available. Some data/map vendors in Canada include well-incident data in their mapping services, and allows a user to post the data on maps, and cross sections. Call your data/mapping package provider for details. If your mapping and cross section software has the data included, use this methodology to import data into Petrel, or use your preferred software to supply maps and cross sections to field personnel.

Data:

This paper focuses specifically on kicks and blowouts reported to the BC Oil and Gas Commission (OGC). Pending data availability, the methodology may also be applied to lost circulation events. The methodology may be used in any basin, provided incident data are available. This paper assumes that the reported bit depth of the incident is the well depth from which the incident-related flow originated. Well control data are also available from several private vendors in Canada.

The OGC requires operators to report Kicks and Blowout incidents. The OGC database includes data collected since 1976. As of August, 2018, nearly 900 incidents have been recorded, including 878 kicks, and 16 blowouts. The Kicks and Blowout data are tabulated into a spreadsheet, which is hosted and available to access, free of charge, on the OGC’s website at: https://iris.bcogc.ca/generic_ogc/Ext_Accnt.Logon

A free account for the OGC Website is required to access the data, and can be created at: https://iris.bcogc.ca/generic_ogc/Ext_Accnt.Welcome

Fig 2. OGC website screen captures

Fig 2. OGC website screen captures

Fig 2. OGC website screen captures

Fig 2. OGC website screen captures

Once a user has logged into the website, select the link to the “Drilling Kicks and Blowouts by Area” CSV file, and input the date range. The author recommends inputting a large date range to ensure no incidents are missed.

Fig 3. Sample of OGC data, imported into Excel.

Fig 3. Sample of OGC data, imported into Excel.

Data included in the report are: Incident Type, Well Area Name, Well Authorization (WA) Number, Well Name, Drilling Event, Confidential Flag, Incident Date, Depth, Numerical Formation Code, Formation Description (Formation Name), Influx Size (m3), SIDPP (KPa), SICP (KPa), Kick Control Mud Density (kg/m3), Occurrence Mud Density (kg/m3), and comments (usually a written description of the event). For the purposes of this paer, many of the columns have been hidden in screen-captures of the workflow.

While the data in this example were downloaded from the OGC, several vendors in Canada contain similar data from British Columbia, and Alberta. Call your data vendor for more details.

Workflow Description

When the spreadsheet has been downloaded, perform a quality control (QC) check to look for incidents in which the comments are spread over several rows. The comments must be combined into a single row by either combining the comments into a single cell, or multiple comment cells in the same row.

Following the initial QC, the wells in the spreadsheet must be matched to the wells in the user’s Petrel project. If the user’s Petrel wells are identified by UWI, there is an extra step, as the OGC’s spreadsheet lacks UWI information. If the Petrel well database includes the WA numbers, copy both the WAs and the UWIs into a new tab in the spreadsheet. Otherwise, a software database such as AccuMap or GeoScout will be required to source the WA and UWI Data for the wells in the target area of interest. After the UWI and WA data have been imported into the OGC spreadsheet, perform a VLOOKUP command to merge the UWI data into the OGC dataset as a new column.

When the UWIs have been integrated into the Kicks and Blowouts spreadsheet, the next step is to QC the remainder of the spreadsheet. It is critical to ensure that units in the spreadsheet match with the units in the Petrel Project. Any missing data cells must be represented as null values. The author suggests adding at least one extra column, providing a numerical code for kicks (1) and blowouts (2). This provides a simple method for displaying them on a petrophysical well log as point data. QC of stratigraphy must be done once the data are in Petrel, as they can easily be cross-referenced against the user’s tops picks and/or geological model. Check for missing mud weight data. If the incident mud weight, control mud weight, or incident depth is missing in the spreadsheet, look in the drilling tour sheets to find the data.

The spreadsheet can then be loaded into Petrel using the Point Well Data import functionality.

Point Well Data (PWD) can import any spreadsheet into Petrel, and allows the user to determine the types of data imported by column (ie: text, continuous or discrete numerical data, dates, etc.). The two most critical columns in the spreadsheet for the PWD import are the Well Identifier (commonly the UWI) and the depth. Assign and name the columns in the import dialogue box. When the data are imported, Petrel will assign the data points to the associated measured depth (MD) along the wellbore. Perform a QC of the data in Petrel’s database. Any data from the spreadsheet can then be displayed or modeled by Petrel.

The author also recommends that a user request the PPFG and mud density data for wells owned by their company from their reservoir engineer, and loads these data into Petrel as well-log curve data. The PPFG and mud weight plots can then be incorporated into a well-section window template for well planning purposes.

The kicks and blowouts data may be displayed many formats, including, but not limited to:

1- Well-Section window. Display the kick and control weight information as a point log, preferably with the Gamma Ray (GR) track as the GR log is the most common log in MWD tools. Include key tops in the well, especially strata that are problematic for well control. Print out (or PDF) a copy of the well-section, and provide it to the drillers and wellsite geologists. A user may consider posting the kick control mud weight along the same track.

Fig 4. Well section window with GR curve, tops, and kicks displayed at depth vs incident mud weight.

Fig 4. Well section window with GR curve, tops, and kicks displayed at depth vs incident mud weight.

2- Map view. Display points on a 2-D map or 2-D window to get a visual representation of where incidents are relative to the proposed well. The incident formation name or other data may be posted alongside the well points.

Fig 5. Map of Area of Interest showing positions of incidents and stratigraphy of incidents

Fig 5. Map of Area of Interest showing positions of incidents and stratigraphy of incidents

3- Intersection window. Include the geological model (tops surfaces), nearby incident wells (with GR logs), and display the desired incident data on the wells.

4- Post the kick locations with (QC’ed) formation information on a 3D window.

Fig 6. 3D Map depicting kicks at formation.

Fig 6. 3D Map depicting kicks at formation.

5- Any other modeling or methodology to display data critical to operations, and control of any potential incident.

Workflow outline

1- Obtain well incident data from preferred vendor.

Fig 7. Downloaded data.

Fig 7. Downloaded data.

2- Quality control check and edit the spreadsheet so it can be imported as Point Well Data.

  1. Ensure the Well Identifiers on the spreadsheet match Petrel’s Well Identifiers.
  2. Consolidate “comments” to single row.
  3. Ensure all units match the project units.
  4. Other typical cleanup so it can be imported as point well data. Ie:
  • Missing the incident mud weight or other cells. With thorough investigation into the drilling tour sheets, many of these missing data points can be found.
  • Assign a designated null point (such as -999.99) to cells without data.

Fig 8. Data amended with well ID for Petrel.

Fig 8. Data amended with well ID for Petrel.

3- Import as “Point Well Data.” QC imported data.

Fig 9. Point Well Data import screen.

Fig 9. Point Well Data import screen.

Fig 10. Point Well Data imported into Petrel.

Fig 10. Point Well Data imported into Petrel.

4- Display data points on a log in a well section window.

a-Select a track to display data. Either on the gamma track, or create a new track:

  • If all wells have incident mud weight, display in mud weight space.
  • If some mud weights are missing, use a numerical value, 1=kick, 2=blowout
  • Include a point set for the incident control mud weight.
  • Alternatively, use different symbols for Kicks and blows to differentiate.

b-If possible, acquire copies of the drilling tour sheets, and create a mud weight log for each incident well. Display point data along a mud weight track.

c-If possible, annotate with linear distances from planned well to incident wells.

5- Display incident points on 2D-Map. If desired, include 5, 10, and 15 km radius polygons from planned well. Data may also be displayed in a 3D window.

6- Create 2D intersection window that intersects all nearby incidents and planned well. Load base geological stratigraphic model, incident wells (with GR, and other desired curves), and kicks point data.

7- Print and/or export the maps, intersection windows, well section windows, etc. via pdf, PowerPoint, or other preferred delivery method. Include in planning documentation/well files.

8- Deliver exported diagrams to well delivery team, including mudlogger/wellsite geologist, drilling engineer, and OSR on Rig.

Contact e-mail: [email protected]

Emanuel Martin
Emanuel Martin is a Petroleum Engineer graduate from the Faculty of Engineering and a musician educate in the Arts Faculty at National University of Cuyo. In an independent way he’s researching about shale gas & tight oil and building this website to spread the scientist knowledge of the shale industry.
http://www.allaboutshale.com

Leave a Reply

five × 3 =

Top